Skip to content
Star Energy Construction

QUESTIONS

Frequently Asked Questions

Every answer that appears anywhere on this site, collected here and grouped by the work it belongs to. Each group links back to the page it came from, where the same question sits next to the scope it refers to.

START HERE

Before You Call

Which line is yours, which number to call, and what happens after you get in touch.

Do you work outside Las Vegas?

We work across the valley: Las Vegas, Henderson, Summerlin, North Las Vegas, Boulder City and surrounding areas. Anything further out depends on the size of the job, so ask when you call. Our office is by appointment only, which means a site visit is usually the faster first step for both of us.

Can you replace windows while we are living in the house?

Yes — occupied-home replacement is ordinary work for this line. Openings are handled in sequence rather than all at once, and we agree beforehand on which rooms are worked on which days, and on access for the crew. Window coverings, furniture near the openings and pets are worth talking through before the first day.

Can you do commercial work in a space that is still operating?

That is a large part of the commercial side: tenant improvement and repairs in offices, retail, warehouse and healthcare spaces that stay open. It usually means phasing the work, agreeing hours and access with the property manager, and separating the work area from the part still in use. Tell us those constraints early, because they shape the scope.

Home

WINDOWS & DOORS

Windows, Entry Doors and Patio Doors

Measurement, occupied-home replacement, glass and hardware.

What's the difference between the windows work and the doors work?

Windows covers replacement and new-construction glazing across the home. Doors covers entry doors and patio (sliding) doors specifically — different hardware, different thresholds, different measurements.

Do you handle both entry doors and patio doors?

Yes. Entry doors and patio doors are both part of this line; each has its own page with the configurations we install.

Can windows and doors be done as one project?

Yes. Many jobs combine both. We measure every opening in one visit and put the full scope — windows and doors — in one written proposal.

Do you work in occupied homes, or only new construction?

Both. Most of this line's work is replacement in occupied homes; we also install in new construction, working from the framing stage.

Can I replace just a few windows instead of the whole house?

Yes. Replacement is priced and scheduled by opening, so a partial project — a few rooms, one elevation — is a normal way to start.

What is a "retrofit" window?

A retrofit (or insert) window is built to fit inside your existing frame, which stays in the wall. It's the more common approach for occupied homes because it disturbs less of the surrounding stucco and drywall. The replacement-vs-new-construction section above explains the difference in more detail.

Do I need a permit to replace windows?

It depends on the scope of the work. We review the specifics during the estimate and note what applies to the project in the written proposal.

What glass should I use on a west-facing room?

That depends on the specific opening, its shade, and the rest of the house — which is exactly what the on-site visit covers. We recommend a glass package with its U-factor and SHGC values listed in writing, not a generic answer in advance.

How long does a window replacement take?

It depends on the number of openings and the window type. We put a schedule in writing as part of the proposal once the openings are measured.

Do you work with HOA approval requirements?

Yes. If your HOA requires documentation before exterior work — window style, color, or grid pattern — we prepare what's requested as part of the proposal.

Can a patio door be replaced without touching the surrounding wall?

In most cases, yes — the existing opening and frame are used as the starting point. We confirm this against the specific opening on the visit.

What's the difference between a sliding and a hinged patio door?

A sliding door glides on a track and needs no swing clearance; a hinged (French-style) door swings open and needs clear space on one side to open into. Which one fits depends on the room layout, covered in the entry-doors and patio-doors sections above.

Do sidelites come with every entry door?

No — sidelites are an option alongside a single entry door, not a standard feature. Whether they fit the opening is part of the on-site measurement.

Do you handle both the door and the surrounding frame?

Yes. Door replacement includes the frame and threshold, not just the door panel — that's what gets measured and sealed as one unit.

Windows & Doors

GENERAL CONSTRUCTION

Remodeling, Additions and Commercial Work

Scope in writing, permits, living in the house, and what happens when a wall comes open.

I'm not sure which of the four services fits — what do I do?

Start with a phone call or the estimate form and describe the project in plain terms. The scope of work, not the category label, decides which page and which process apply — the team sorts that out with you before anything is written down.

Can one project involve more than one of these four services?

Yes. A whole-home renovation, for example, can include remodeling and a room addition at once. That gets handled as one coordinated scope rather than as separate jobs, and it's reflected in a single written estimate.

Do you work from plans we already have, or only from scratch?

Both. General Contracting covers executing an existing architect's or engineer's plan set as well as scoping a project from the beginning, and each of the four service pages spells out what that means for that kind of work.

Is Windows & Doors part of General Construction?

No — Windows & Doors has its own number for standalone window and door work (see the Windows & Doors page for that number). General Construction coordinates that trade internally only when it's part of a larger construction scope.

Can we live in the home during a remodel?

In most cases, yes — the areas under construction are contained and the rest of the home stays usable. Whether that's practical for your project depends on scope, and we'll say plainly if a particular phase means a space needs to be vacated.

What happens if you find something unexpected once a wall is open?

It's documented, explained, and confirmed with you in writing — including any change to price or schedule — before we act on it. Nothing gets built into the estimate after the fact without that conversation.

Do you replace windows or doors as part of a remodel?

Yes — when a remodel calls for it, that piece is coordinated with Windows & Doors as part of the same schedule. See /windows-doors/ for that line directly.

Who decides finishes and fixtures?

You do. We confirm what a selection means structurally or for code, but layout, materials, and finish choices are the owner's decision throughout.

Do you need architect or engineer plans before you can start?

For new construction, yes — a plan set is required before permitting and construction, whether it's one you already have or one developed as part of the project's early phase.

Can you build an addition onto any existing home?

It depends on the existing structure and the site. That's exactly what the site visit confirms before any scope or estimate is written.

Who handles the windows and doors on a new build?

The General Construction team schedules that work and coordinates it directly with Windows & Doors — see /windows-doors/.

How is a whole-home renovation different from a remodel?

Scale and sequencing, mainly. A renovation that touches most systems in a home at once is phased and scheduled differently than a single-room remodel, even though many of the same trades are involved.

Can you build out a space while it stays open?

Often, yes — occupied and operating sites are one of the conditions the site visit is specifically for. What's practical depends on the space and the scope, and we'll say directly where it isn't.

Do you handle multi-phase projects?

Yes. A project split across phases — by floor, by tenant space, or by budget cycle — is scoped and scheduled as a coordinated whole, with one point of contact throughout.

Do you work directly with our architect or designer?

Yes. We build from architect or engineer plans you provide, and coordinate directly with your design team on questions that come up during construction.

Are healthcare build-outs handled differently?

The construction sequence is similar to other commercial work, but the code and inspection requirements are stricter and are confirmed with the relevant authority before scoping is final.

What does a general contractor actually do day to day?

Coordinates the trades, files and tracks the permits, keeps the project on the sequence agreed in the written scope, and documents anything that changes along the way.

We already have architect plans — do we still need this?

Yes. Plans describe what's being built; general contracting is how it gets built — permits filed, trades scheduled, inspections passed, and the whole sequence coordinated.

What permits will our project need?

That depends on the jurisdiction, the scope, and the specific work, so it's confirmed for your project rather than listed generically — that confirmation happens during pre-construction.

How are decisions and changes tracked during the project?

In writing, as they come up, through a single point of contact — not verbally on site and not reconstructed later from memory.

General Construction services

ROOFING

Roofing

Repair versus replacement, tile and low-slope roofs, permits.

Do you repair roofs, or only replace them?

Both. A localized problem on an assembly that is otherwise sound is a repair. When the underlayment or the covering has reached the end of its life across the roof, patching one area tends to move the problem rather than solve it, and replacement is the honest answer.

Can you tell me over the phone whether I need a new roof?

No. The age of the roof and what you are seeing inside give a first idea, but the answer comes from looking at the roof itself and, on a tile roof, at the underlayment beneath the tile.

Do you work on commercial roofs?

Yes. Flat and low-slope roofs on commercial buildings are part of this work, and so are the flat sections that many homes here have over a patio or an addition.

Is a permit required to re-roof a building?

It depends on the jurisdiction and on the scope of the work. We confirm what applies for your address and file the application for the work we perform, so you are not the one chasing it.

Which line do I call for roofing?

The General Construction line — the same one used for remodeling and new construction. Roofing is part of that side of the business, not a separate company. The number is on the buttons at the top and bottom of this page.

Roofing

DAMAGE

Fire and Water Damage

What to do first, what the cleanup covers, and how the rebuild is handled.

What should I do first after a water leak?

Close the shutoff valve if you can reach it safely, and leave power off to any area where water has reached wiring or outlets until it has been checked. Then photograph each affected room before anything gets moved. After that, call and describe what happened and what is wet.

Do you handle the cleanup, or the repairs as well?

Both. We are a general contractor, so the same team that extracts the water, dries the structure and removes damaged materials also rebuilds the walls, floors and finishes afterward.

Will my insurance cover this?

That is a question for your insurance carrier, and it depends on your policy and on what happened. What we can do is document the damage and describe the scope of work in writing, so you have something concrete to give them. The coverage decision is theirs.

How quickly does water damage need attention?

Water keeps moving into materials for as long as it sits there, so the affected area generally grows rather than stays still. That is the reason to call rather than wait — not a specific number of hours.

Do you clean smoke and soot, or only structural damage?

Both. Cleanup covers soot on surfaces and the odor that stays in materials, along with removing what is too damaged to keep, and the structural work is part of the same job.

When is the General Construction line answered?

The published business hours are Monday–Friday, 8:00 AM–5:00 PM. What happens with a call placed outside them is not something this page states, because it is not something we can confirm for you yet.

Fire & Water Restoration

AREAS & ESTIMATES

Where We Work, and How an Estimate Happens

The valley, the site visit, and what you get in writing.

Do Windows & Doors and General Construction cover different parts of the valley?

No — both lines cover the same areas listed above. Which one you call depends on the kind of work, not on where you're located.

Is there a physical showroom or office we can visit?

The office is by appointment only. Call the line for your project to arrange a visit rather than dropping by.

What if my address isn't in one of the listed areas?

Call either line or request an estimate. Coverage for locations outside the listed areas is confirmed per project rather than ruled in or out generically.

What happens after I submit the form?

Your request routes to the line that handles the service you selected. A team member reviews it and replies using the contact method you chose, during business hours, Monday–Friday.

Can I call instead of filling out the form?

Yes. Call the line for your project directly — Windows & Doors or General Construction — and you'll reach the same team.

Do you take calls in Spanish?

Yes — the site and our team are available in Spanish.

Contact

If the Answer Isn't Here, Ask on the Phone

Both lines are listed below, labelled by the work they handle. Or send the details through the estimate form and we'll come back to you.